V1948-EA

Civil Engineering Aid, Leoti KS  Summer 1948

            The summer of 1948, with a semester to go before graduation from K-State, I returned to work for the SW Division of KS Highway Commission and was assigned to the Leoti KS Resident Engineer.  I reported to the Resident Engineer’s office at the east end of their new City Hall.  I was greeted by a fellow in attire fit for a Hollywood movie to depicting extending the railroads west.  In fact he had indeed worked as a Civil Engineer building railroads.  He looked like an Army Retread, out of the old horse cavalry.  He wore a big wide brimmed peaked hat, as in movies of US Cavalry.  He wore britches designed for use with boots with lace up type boots that came up to just below the knee.  He was well prepared to traverse through thorny thickets.  I quelled my initial instinct to laugh – soon aware he was very proud of his prior experiences and the uniform of his trade.  He proved to be a very nice fellow, though a bit odd.  He treated everyone well and sustained an air of professional pride.  The crew liked, respected and accepted him -- with a smile.  He treated me as if an equal, aware I would soon graduate with a degree in mechanical engineering.  He took time to show me special applications of trigonometry, used in railroad engineering, as if necessary to prove he knew his trade.  I was there as an Engineers Aid.  The main task for the summer was to reroute the highway from the west edge of town, up through main street – an obvious political maneuver so the State would pay to pave Leoti’s main street.

            Leoti was in Wheat County, on US 96, with Scott Co and county seat Scott City to the east and Greeley Co with Tribune its county set to the west.  Conditions in Leoti revealed that times had been tough, they were still recovering from the depression, drought and dust storm years, their recovery lagging behind other counties.  Dry land farming was the only industry.  My home town area of Decatur Co, three counties from CO and next to NB, had by comparison made considerable recovery from those difficult times.  Leoti, like Pecos TX where I’d been stationed during WW II, it was off the beaten path. 

            I was assigned to work with Cliff Wright a long time employee of the highway department who had an Civil Engineers classification via the Grand Daddy Clause when the KS Highway Commission established new standards and classifications.  Cliff, a nice fellow and a pleasure to work with, relied on many years as an Engineers Aid during which he’d learned how the highway commission built and maintained highways and bridges.  I had known Cliff the prior summer in Ness City – Cliff had gathered materials samples & I operated the crew that tested them for highway reconstruction. 

            Our initial task, with Cliff in charge, was to stake out the new highway route through town and diagonally NE back to the existing highway route.  It was a relatively simple surveying task, but included most of the principles.  Cliff ran the level and transit when needed, I helped measure and set alignment and slope stakes.  We ran cross section elevations for every 100 feet, for comparison after construction to determine the amount of cut and fill done by the earth work construction contractor – he got paid for how much earth he cut, filled, compacted and graded.

            There were other contracts going on in that area, mostly maintenance and re-raveling of roads.  This required taking and testing samples which was done in a materials lab set up at the east end with separate outside access.

            The City Hall was the new pride and joy of the town.  A nice looking structure made of “local” sand stone from north of Scott City.  The City Offices were on the main floor, accessible from the main entrance, up a flight of steps which gave dignity to the place.  In front was a beautiful new blue Lincoln – it belonged to Bo Minor, the City Clerk.  Bo was a big fellow, about our age, unmarried, who grew up in a home across from the high school.  The first time I saw him he was typing – very rapidly with a dexterity one would not expect from a person his size.  Bo later came to work for the Highway Dept.

            The American Legion occupied the down stairs, in fact community support for this new building was financed in part by donations to build a decent Legion Hall.  The City Offices were a means to collect rent and pay for utilities. 

            The 10 or so fellows, who worked out of this Resident Engineers office, frequented the Legion facilities when not engaged on the job.  The club manager was a charismatic, gravel voiced fellow, well suited to the job.  In this dim lit interior, the off duty personalities of the fellows came to light.  Ernie Zinn, one of our crew, of local origin, had been an armature boxer.  Thankfully he was a mellow fellow.  There was little to do for “excitement” in the town, many of the young fellows drank too much out of boredom.  Bo Minor would periodically provide the transportation to Towner CO, the nearest source of liquor for Dry KS.  It was a chummy bunch, thus important that they, like Ernie, remained amicable after several drinks.  I seldom participated, usually driving north to home on week ends.

            I’d drive home and stay with my parents in order to be with Mary Hamilton.  Mary was home on vacation from school at Colorado Woman’s College.  We planned to get married as soon as we were both out of school.  I would graduate the following January, at mid semester, and she at the end of that school year. 

            While we were surveying the route, a large trailer with Watson Construction Company painted on it’s side was placed near the site.  Cliff said, that’s going to be your office, it’s required by contract that the contractor provide a place for you to test soil samples.  Had I been taking Civil Engineering I would have known about such tests.  Cliff explained how to do the tests using a soil sample test kit provided by the Division Office.  The tests were to determine the optimum amount of moisture required to achieve maximum compaction of the road bed soil.  I didn’t occupy the office very long, as it didn’t take much time to conduct the tests.  I’d weigh a soil samples then add increasing percents of water to a series of samples.  I then compacted each test sample in the kits container by dropping the supplied weight from a specified height the specified number of times.  I would then weigh how much I was able to put in the container for a given amount of water.  From this series I plotted the minimum and maximum amounts of water content required to provide maximum soil density.  It was a sensible practical method of emulating “sheep’s foot” compression.  Contractors would cut dirt from ditch locations and dump it on fill locations.  Grader equipment would spread it out and large water filled roller drums, with protruding steel “sheep’s feet”, would be rolled repeatedly over the new fill to compact the dirt. 

            The contractor had the city lay a pipe to the site and from it filled a tank wagon which the driver would sprinkle over the dirt laid down as part of the compaction process.  Cliff being the Sr member of this operation, and with much more experience, would drive out on the job to observe the progress.  We would notice that the soil being dumped was powdery and dry, there had been no recent rainfall, it would flow out, it was powdery dry black dirt.  He’d shake his head and get after the contractor again to haul more water – to get an extra truck, not enough water was being applied.  The contractor added an extra. even larger, truck to haul more water

            The contractor was using a large integral tractor pulled scoops.  The big diesel engines extended forward of the tractor wheels, counter balanced by the weight of the trailing large scoop full of dirt.  They could haul a lot of dirt in a day and did.  Water hauling could not keep up – though consuming water as fast as the city pipe could provide it. 

            Fortunately it would have probably worked out all right if no water had been added.  All dirt had been moved in a short time and laid down with the same consistency.  Time treated the entire segment the same.  All settled and compacted evenly due to traffic and subsequent moisture drawn up into the road bed.  It’s very important, especially in high fill locations next to bridges, that all dirt be compacted and uniformly.  Many bridge approaches in those days had dips near bridges due to uneven compaction with time.  Later the crew spent hours and hours using “planimeter” instruments to determine the amount of area between the original and final cross section plots.  The cut vs fill measurements, taken for contractor payments, did not reveal the amount of shrinkage there should have been.   Luckily the road turned out to be beautifully smooth – mother nature compressed the road bed and achieved uniform natural shrinkage.

            At the time I was driving a “used” 1939 Ford I’d bought from my Uncle Lee Kump, the home town Ford Dealer.  Lee was able to give me a good price, as it had been in a wreak which caused it to shake a bit at about 60 mph.  I had used it to drive to school.  It’s original engine went out on the way home from school.  Lee sold me at his cost a new “100 hp Mercury engine”, which I installed in his garage.  With this new engine the car would pass through the shakes at 60 mph and run smooth as could be at 80 plus.  I almost lost it on one trip back to Leoti when making sharp turns on a diagonal stretch with sharp turns SW of Oberlin.  There had been a rain that left mud on the lower edge of a sharp banked turn.  I hit that turn fast – too late I noticed the mud!!  I barely managed to keep on the road by making use of a dry upper edge, the tires grabbed and held after the first mud wiped off the tires – it was frightening and enormous relief when the tires regained their grip -- I held it precisely on that narrow strip.  That made me a believer to never trust a roadbed you could not see well in advance after a rain.  That one turn came very close to ending my career.

            On a return trip home going north abruptly the left rear tire blew out!!  I got the car stopped OK and went back and picked up rubber.  The entire tread came off, it was a new tire about one week old.  When I took the tire back the dealer asked, “how fast were you driving?”  I said, “probably a bit over 90.”  He shook his head saying, “never drive a new tire that fast – it takes time for a tire to break in.”  However he replace the tire at no cost.

            When I left Leoti the end of that summer for school, little did I know I’d be back under a new Resident Engineer to run a survey crew for an extensive amount of new road construction – or that I’d bring Mary to Leoti and set up our first home.