Chap6.htm
Chapter
IV The Offensive Launched
The comparative ease with which the
bridgehead between the Taute and the Vire Rivers was established on 7 July
indicated to Americans and Germans alike the existence of a soft spot in the
German defenses. With only Kampfgruppe
Heinz and a small part of the 17th SS
Panzer Grenadier Division defending the area, the Americans were close to
achieving a breakthrough. Hausser, the Seventh
Army commander, shifted a mobile (bicycle) brigade of light infantry and a
reconnaissance battalion westward across the Vire River out of the II Parachute Corps sector. This could be
only an expedient, a stopgap measure, for obviously the troops were not strong
enough, nor the defensive attitude that their commitment implied sufficient, to
stop expansion of the bridgehead. What the Germans needed was a counterattack
by strong forces to demolish the bridgehead and restore the positions along the
canal and the river.
Panzer
Lehr, an armored division recently in defensive
positions near Caen, seemed to Kluge and Rommel an obvious choice. Having just
been replaced by a newly arrived infantry division, Panzer Lehr was scheduled to go into the Panzer Group West reserve and strengthen Eberbach's zone defense.
The division was the only strong force available for transfer to the Seventh Army front to counterattack the
American bridgehead.
Since shifting the division across
the front from the vicinity of Caen to the area west of St. Lo would take
several days, the Germans had to preserve the conditions that still made a
counterattack feasible. They had to find strong forces that were closer to the
threatened area and available for immediate commitment. They settled on the 2d SS Panzer Division, most of which
already was battling the VII and VIII Corps. Although Kluge realized that
drawing part of the SS armored division away from the Seventh Army left might weaken the west flank defenses beyond
repair, Rommel pointed out that the Taute and Vire situation was much more
critical. American success between the two rivers had created a minor
penetration that, if exploited, might well invalidate the German policy of
holding fast. Kluge reluctantly agreed. He approved the plan to send part of
the 2d SS Panzer Division eastward
across the Taute to hold until the Panzer
Lehr Division, moving westward across the Vire, could arrive to
counterattack and demolish the bridgehead.
The Americans, for their part,
having judged the probable German course correctly, hastened to exploit their
success before the enemy could act.
Hopeful that the First Army offensive was at last about to move with
dispatch, but also looking to the lesser goal of shoring up the bridgehead
against counterattack, General Bradley gave XIX Corps the 3d Armored Division,
which had been in the army reserve.
Unwilling to dictate the details of commitment, General Bradley simply
instructed General Corlett to support the 30th Division with the armored
division.
General Corlett had definite ideas
of his own. He wanted to get the 3d Armored Division across the Vire, pass it
through the 30th Division, and advance rapidly to the south to seize and hold
the high ground west of St. Lo. Unfortunately, it was difficult to translate
the desire into action, for General Corlett was severely ill and confined to
bed at his command post for several days. He telephoned the armored division
commander, Maj. Gen. Leroy H. Watson, in the late afternoon of 7 July and
instructed him to cross the Vire River as soon as he could and then drive
south. "How far do you want me to go?" General Watson asked. "The
Germans have little or nothing over there," the corps commander replied,
"just keep going."
Thus, at the beginning of the new
phase of action between the Taute and the Vire, clarity of aims was lacking.
The army commander envisioned a build‑up of the bridgehead forces with
armor; the corps commander foresaw a limited exploitation to the ridge west of
St. Lo; the armored division commander understood that he was to make an
unlimited drive to the. south. The incompatibility of intent led to some confusion
that was the beginning of increasing disorder.
Although General Corlett had known
for some time that the armored division might be attached to his corps, illness
prevented him from personally directing its commitment. To help him with the
operation, Maj. Gen. Walton H. Walker, commander of the XX Corps, which had not
yet been committed to action, temporarily acted as Corlett's representative.
General Watson was surprised by the
sudden news of his impending commitment. He had not been informed beforehand of
the corps objectives and plans, nor had he discussed with Generals Corlett and
Hobbs such arrangements as co‑ordinating artillery fires, constructing
additional bridges, facilitating the entry of the division into the bridgehead,
providing passage through the 30th Division, or determining routes of advance.
Guessing that General Corlett intended to commit the entire armored division,
which happened actually to be the case, Watson decided to send one combat
command across the river first.
General Watson's force was one of
the two "old‑type" armored divisions in the European theater.
Both had been in England preparing for the invasion when a new table of
organization, effective September 1943, had triangularized the armored division
and reduced its size to make it less cumbersome and more maneuverable. Because
reorganizing the two divisions in England might have delayed their battle
readiness, they had retained their original organization. In contrast with the
new and smaller armored divisions, the 3d Armored Division possessed two combat
commands instead of three, 232 medium tanks instead of 168, and with its
attached units numbered over 16,000 men instead of 12,000. Powerful, if
somewhat unwieldy, the 3d Armored Division was subdivided into twin combat commands,
each a strong force easily detached from the whole. Neither Bradley nor Corlett
had specified the size of the armored force to be committed west of the Vire
River on 7 July, but Watson's decision to commit one combat command as a start
was normal.
The armored division had arrived in
Normandy late in June. Early plans for July had caused the division to be
tentatively alerted for an attack in the VII Corps sector; but because of
increasing danger that the Germans might counterattack the army left, east of
the Vire River, the division remained in army reserve. Since Combat Command A
(CCA) had taken part in a limited objective attack at the end of June, General
Watson decided to give Combat Command B (CCB), headed by Brig. Gen. John J.
Bohn, the first mission between the Taute and the Vire. In an assembly area
east of the Vire River, CCB had been prepared to execute several potential
plans of action, among them one based on the assumption that it would attack
south after the 30th Division seized St. Jean‑de‑Daye‑exactly
the situation the unit was called upon to implement. (See Map 5-1)
Having been alerted for movement at
1615, 7 July, and having received the march order at 1830, General Bohn led his
column toward the Airel bridge. Although he had asked permission to phone
General Hobbs to co‑ordinate his river crossing with the infantry‑wire
had been laid to the 30th Division headquarters in anticipation of this kind of
emergency‑the 3d Armored Division chief of staff assured him that the
division staff would take care of all such details. Bohn was to perform under
3d Armored Division control.
General Bohn had quite a task. He
had to get 6,000 men in 800 vehicles and 300 trailers, a column over 20 miles
long, across a single bridge that was under enemy fire, enter, partially during
the hours of darkness, a bridgehead that belonged to another division, and
attack a distant objective in strange territory with inexperienced troops. [6 July 5CCB consisted of a reconnaissance company
and three tank battalions of the 33d Armored Regiment; one battalion and the
headquarters of the 36th Armored Infantry Regiment; the 54th and 391st Armored
Field Artillery Battalions, each with an attached battery of antiaircraft
artillery; a company each of the 83d Reconnaissance Battalion, the 23d Armored
Engineer Battalion, the 703d Tank Destroyer Battalion, the 45th Armored Medical
Battalion, and the division Maintenance Battalion; and an additional battery of
antiaircraft artillery.]
Since the time length of a combat
command column was normally estimated at four hours, and since the Airel
crossing site was but five miles from the combat command assembly area, the
unit under normal conditions should have been across the Vire River shortly
after midnight, 7 July. [This
was an estimate given by CCA of the 3d Armored Division on 10 July, based on a
speed of 8 miles per hour at night and 12 miles per hour, but with a longer
interval between vehicles, during the day.]
Conditions on the night of 7‑8 July were far from normal. The
combat command could use only one road to approach the river, a road that was
narrow, rain‑soaked, and heavily burdened with other traffic. Maintaining
radio silence, the armored force proceeded slowly toward an area that was
receiving intermittent enemy artillery fire and becoming increasingly congested
with vehicles. The 30th Division alone, attempting to reinforce, supply, and
stabilize the bridgehead, was having difficulty maintaining a continuous flow
of traffic across the river. Of the three vehicular bridges constructed near
Airel, the ponton structure had been knocked out during the afternoon by enemy
shells. Of the two remaining‑the permanent stone bridge and the floating
treadway‑one had to carry traffic moving east from the bridgehead. A
single bridge was all that was available for CCB, and even that had to be
shared with the 30th Division, which was in the process of moving an additional
infantry battalion into the bridgehead. With vehicles of both organizations
intermingling, the enemy fire falling near Airel further retarding the flow of
traffic, and blackout discipline increasing the difficulties, the combat
command did not get its last vehicle across the bridge until long after
daybreak on 8 July.
Across the river, the combat command
had to find lodgment in a small area crowded with 30th Division troops and
closely hemmed in by an active enemy. A tank battalion received enemy small
arms and mortar fire as it moved into assembly just south of the Airel‑St.
Jean--de‑Daye road. A reconnaissance company scouting several hundred
yards south of the same road ran into a road-block guarded by enemy infantrymen
with machine guns. During the night, minor enemy forces attacked and drove one
small armored unit back to the main road. As the men sought places where they
could park their tanks and other vehicles west of the Vire, they were harassed
by enemy mortar and artillery fire.
To pass one major element through
another is always a delicate procedure. Passing the combat command through the
30th Division was to be a frustrating experience. Without reconnaissance on the
part of the armored unit and without co‑ordination between the combat
command and the infantry division, misunderstanding was inevitable.
On the
night of 7‑8 July the 30th Division had the bulk of its combat troops
west of the Vire. One battalion of the 119th Infantry held the left flank,
which rested on the Vire River, and another battalion of that regiment was
moving into the bridgehead. The three battalions of the 117th Infantry, in the center,
occupied positions just short of the St. Jean‑de‑Daye crossroads.
Two battalions of the 120th Infantry were echeloned to the right along the road
between St. Jean‑de‑Daye and the canal. West of that road as far as
the Taute River, about four miles away, the area still had to be cleared by the
113th Cavalry Group, which had followed the 120th Infantry across the canal.
As soon as General Hobbs had learned
that the combat command was to enter the bridgehead, he had ordered his troops
to clear the main road west of Airel of all unnecessary traffic and give the
armor priority of movement. He envisioned the advance of the combat command to
the St. Jean‑de‑Daye road intersection, where the armor would turn
left and drive rapidly south along the good highway toward the corps objective,
the high ground west of St. Lo. The first part of this action, the advance to
the crossroad, would secure the bridgehead objective, which the 30th Division
had not taken. The second part, the drive to the south, would provide the
infantry division with an armored spearhead. But General Hobbs did not have
operational control of Combat Command B.
General Watson, the armored division
commander, gave some consideration to this course of action but decided against
it. An advance along the Pont‑Hebert highway would present an open flank
to the enemy between the highway and the Taute, and taking the crossroads and
establishing adequate flank protection would involve the armored unit in a task
that might delay the movement southward. General Watson therefore directed
General Bohn to turn left immediately after crossing the Airel bridge, move
southwest over a network of unimproved roads and trails, and reach the main
highway leading south at a point three miles below the St. jean‑de‑Daye
crossroads. The division field order and overlay subsequently showed a short
arrow pointing generally southwest from the Airel bridge.
There was nothing unusual in sending
armor over secondary roads or crosscountry to outflank or bypass resistance
before resuming an advance along the main axis, and General Watson did not
think that the combat command would be unduly delayed. The distance to the main
highway was between four and six miles. Although the combat command had not
made a prior reconnaissance, the ground was believed lightly held by the enemy.
The risk of getting the tanks involved in hedgerow tactics of fighting from one
field to the next seemed slight, and the potential complications of pointing
the command diagonally across the zones of two regiments of the 30th Division
seemed minor.

Another factor that contributed to
General Watson's decision on the route of advance was the framework of
reference that governed the employment of armor in the Cotentin at this time.
The knowledge that German antitank guns were superior to American armor plate
produced among American troops an unwholesome respect of all enemy antitank
weapons. Perhaps the most effective was the German 88‑mm. antiaircraft
gun, which was used also against ground targets. just as Americans tended to
confuse assault guns with tanks, it became general practice to refer to all
German antitank guns as 88's‑the 75's as well as the lighter weapons,
whether towed or self‑propelled. The experience of CCA of the 3d Armored
Division at the end of June had specifically indicited ‑that tanks could
escape the deadly enemy antitank fire by avoiding the roads and trails and
advancing crosscountry. Directives and memoranda from higher headquarters
endorsed the view. The 3d Armored Division training had stressed the techniques
of field--to‑field movement; rapid advance along the narrow and
restricted highways of the hedgerow country and under the sights of well‑sited
zeroed‑in enemy weapons‑ was considered rash, reckless, and ill
advised."
General Bohn had divided his command
into three task forces‑each formed around a reinforced tank battalion and
an administrative element. They were to deploy in column on a thousand yard
front and attack in normal armored manner, the leading task force advancing in
two columns along parallel routes. Shortly after daybreak, 8 July, even before
all the combat command's units were across the Vire, the leading task force
commenced the attack. Without artillery preparation, men and tanks began to
move southwest in an area traversed by country roads and hedgerowed lanes.
Almost at once the task force met
and destroyed five Mark IV tanks attached to Kampfgruppe Heinz. In the exchange of fire the task force lost one
tank. Through this auspicious beginning augured well, the task force soon
became involved in the kind of tortuous advance that had become typical of
offensive action in the hedgerow country. The armor overflowed the narrow
trails and entered the fields, making it necessary for demolition teams and
engineer bulldozers to breach the hedgerows. Though the task force received two
additional dozers and encountered only light resistance, the day's gain totaled
only about a mile and a half.
The limited advance was
disappointing, particularly since only minor units had come to the aid of Kaniftruppe Heinz during the day.
General Watson informed General Bohn that the progress of the combat command
was unsatisfactory. Pointing out the "great opportunity" that faced
the command and the "good chance of a break through," he urged Bohn
to fit his method of advance to the situation. If he found it impossible to go
ahead on the roads, he was to move cross‑country; if his tanks bogged
down in the fields, he was to dispel among his subordinate commanders the
"inflexible idea that cross‑country progress is
essential." Although there was no
real difference between methods of advance in this area, General Bohn had
emphasized to his task force commander the need for speed and had insisted that
he use the roads wherever possible. The task force commander had been reluctant
or perhaps simply unable to move his men and vehicles out of the fields.
Meanwhile, in the rear areas of the
bridgehead there was a disheartening spectacle of confusion, a confusion
throttling an orderly development of the bridgehead and the attack. Seven
infantry battalions, one tank battalion, and an artillery battalion of the 30th
Division; one infantry battalion, three tank battalions, and two artillery
battalions of CCB; plus an almost equal number of supporting troops of both
units jammed an area of hedgerowed labyrinths scarcely four miles wide and less
than three miles deep. To the tankers the fields seemed full of riflemen; to
the infantrymen the terrain appeared covered with armor. In this overpopulated
morass of mud, tank treads chewed up wire and destroyed communications, while
unemployed combat units jostled supply personnel attempting to carry out their
functions. Infantrymen ignorant of the armored commitment were surprised by the
appearance of tanks, while tankers were indignant when they found infantrymen
occupying fields useful as armored assembly areas. Experienced troops might
have surmounted the difficulties engendered by restricted space, but both
infantrymen and tankers were novices. Nervous soldiers of both units aggravated
conditions by firing their weapons wildly in rear areas and on the flanks. Each
organization accused the other of stifling the advance.
By striking southwest immediately after crossing the Vire, the combat command had impinged on the sector of the 119th Infantry. Only after moving forward several miles would the armored unit have created a zone for itself between the 119th and the 117th Regiments. Agreement on this procedure was reached by representatives of armor and infantry at a special conference for co‑ordination during the afternoon of 8 July. At the same time, the artillery commanders of the 3d Armored and 30th Divisions were meeting to keep the artillery of one from firing on the troops of the other."
General Hobbs complained bitterly of
the presence of the combat command in the bridgehead. He protested that the
armor was cluttering up his sector and bogging down his advance. The presence
of tanks in his regimental rear areas, he was sure, was preventing artillery,
supplies, and men from reaching his forward areas quickly. Promiscuous tank
fire, he reported, had caused sixteen casualties in his division. It was
impossible, he contended, to protect his troops with artillery fire for fear of
striking armored elements. So incensed was he that he ordered his artillery to
give the infantry the fire requested "wherever they are, irrespective of
armor or anything else." He felt that either the combat command or the
infantry division had to be halted, for both could not operate in the
restricted area. He was convinced that the 30th Division without CCB would
reach the corps objective rapidly, but that CCB without the 30th Division would
"never get anyplace." The armored force commander had been
"sitting on his fanny all day, doing nothing" and had not
"turned a track in 95% of his vehicles all day long." The 3d Armored
Division commander had "only a hazy idea" of what was happening. And
there were "too many people in the party,” too many commanders giving un‑co‑ordinated
orders.
In hope of resolving the situation
and introducing unity of command, General Corlett placed the responsibility of
the bridgehead operations on General Hobbs. Attaching CCB to the 30th Division
on the evening of 8 July, Corlett directed Hobbs to get the armor and the
infantry to make a co‑ordinated effort to the south. By this time, Hobbs
did not want the combat command. He had his own attached tank battalion and
tank destroyers, he asserted, and with them he could exploit the breakthrough
his infantry had achieved. When Corlett advised that he would have to keep the
combat command because it "could not go any place else," Hobbs agreed
to let the armor "just trail along."
The combat command was not entirely
at fault. While it had not displayed the daring and dash expected of armor, the
principal reason for the failure was the hasty, ill‑planned, and un‑co‑ordinated
commitment into a bridgehead of inadequate size. Its route of access into the
bridgehead had been sharply restricted, its operational space was small, its
routes of advance were poorly surfaced and narrow. The road network was
deficient, the hedgerows presented successive, seemingly endless obstacles, and
the swampy Cotentin lowland had become even more treacherous and soft because
of rain. Operating in a zone that seemed to belong to another unit, men and
commanders of the combat command felt like intruders. When they called for fire
support from their organic artillery, they had to wait for clearance from the
30th Division Artillery. Attacking on a narrow front, the combat command held
the bulk of its strength, useless, in the rear. Separated from its parent
headquarters, the armored force received little guidance and encouragement.
Concern over the minor advance and
the disorder in the bridgehead had not detracted from another potential hazard.
General Corlett had apparently supposed that crossing the Vire et Taute Canal
and taking St. Jean‑de‑Daye would compel the Germans on the east
bank of the Taute to withdraw. Counting on light delaying resistance, the corps
commander had given Colonel Biddle's 113th Cavalry Group the mission of
clearing the area between the 30th Division right flank and the Taute, but
opposition on 8 July was so determined that the cavalry troops had had to
dismount from their light tanks and armored cars and fight through the
hedgerows like infantrymen. Although
elements of the 30th Division secured the St. Jean‑de‑Daye
crossroads on 8 July, they did not take le Desert, a few miles to the west.
Anticipating the possibility of a counterattack from the Taute River area,
General Corlett directed General Watson to send CCA into the bridgehead to
protect the right flank. Specifically, the combat command was to reinforce the
calvalry group.
On the afternoon of 8 July, Brig.
Gen. Doyle 0. Hickey's Combat Command A crossed the Vire and moved west along
the main road toward the Taute. Its passage through the bridgehead intensified
the congestion. To add to the confusion, the last battalion of the 120th
Infantry entered the bridgehead after being replaced along the north bank of
the Vire et Taute Canal by a suddenly available battalion of the arriving 35th
Division. The battalion of the l20th moved south through St. Jean‑de‑Daye.
When the infantry met and crossed the CCA column, which was moving west,
inevitable delays occurred. "Every road is blocked by armor," Hobbs
complained.
Although General Hobbs had said he
would let CCB trail along after the 30th Division in his attack south on 9
July, General Corlett insisted that he use the armor to spearhead his advance.
The objective was no longer the high ground west of St. Lo, which General
Corlett felt could not be attained by a quick armored thrust, but instead Hill
91 at Hauts‑Vents, a little more than three miles ahead of the combat
command.
About 300 feet above sea level and
aptly named for the high winds that sweep across it, Hauts‑Vents
overlooks the Cotentin lowlands as far north as Carentan. It dominates the St.
Jean--de‑Daye‑Pont‑H6bert road and commands the Vire River
crossing to the east that leads to St. Lo. It would serve as a compromise
objective. If CCB gained Hauts‑Vents quickly, General Corlett thought he
might then attack St. Lo from the northwest, or perhaps drive farther south to
the original corps objective. With these intentions of the corps commander in
mind, General Hobbs ordered General Bohn to resume his attack on 9 July,
continuing southwest across the St. jean‑de‑Daye‑Pont--Hebert
highway to Hauts‑Vents and Hill 91.
On the second day of the attack, 9
July, General Bohn passed his second task force in column through the first.
Passage was difficult because of the terrain, but by midmorning the task force
was making slow progress across muddy fields and along narrow roads and trails.
Only occasional harassing artillery fire came in. The opposition seemed slight.
This prompted Hobbs to order Bohn to get the task force out of the fields and
on to the roads.
In part, the order was virtually
meaningless. The roads in the area were little better than trails‑narrow,
sunken in many places, and frequently blocked by trees and overhanging hedges.
Movement along these country lanes was not much different from cross‑country
advance, and possibly worse. A fallen tree or a wrecked vehicle could easily
immobilize an entire column. Floundering in the mud, fighting the terrain
rather than the enemy, the tankers could not advance with true armored
rapidity.
The meaning of the order lay not in
General Hobbs' directive to get onto the roads but rather in his judgment that
the combat command was not acting aggressively enough to get out of the
repressive terrain. Although General Bohn had ordered the attacking task force
to use the roads in the same sense that Hobbs had meant it, the task force
commander had instructed his units to use the "hedgerow method of
advance." When Bohn repeated his order and when the task force commander
seemed hesitant about carrying it out, Bohn started forward to expedite
personally a change in the manner of attack.
Traffic congestion, intensified by
intermittent rain, so delayed General Bohn that he did not reach the task force
command post until an hour after noon. Reiterating his orders, he told the task
force commander to get on the roads and move. In response, the officer demanded
with some heat whether General Bohn realized that he was "asking him to go
contrary to General Corlett's directives, General Watson's directives, and the
rehearsals . . . of the tank‑infantry teams." At this point, General
Bohn himself took charge of the task force.
While Bohn was attempting to get
through the traffic congestion to the task force, General Hobbs was becoming
increasingly dissatisfied with the slow progress. Unwilling to suffer longer
what appeared to him a clear case of inefficiency, Hobbs sent Bohn an
ultimatum: either reach the objective, Hauts‑Vents, by 1700, or
relinquish command.
General Corlett had also become
dissatisfied. Learning at 1400 that the leading task force had advanced only
600 yards in eight hours but had lost not a man or a tank to German fire, Corlett
had come to the conclusion that Bohn was not pressing the attack with
sufficient vigor. He requested General Walker, who was assisting because of
Corlett's illness, to inform Bohn that if Bohn's relief were recommended, he,
Corlett, would have to concur. Walker transmitted the message shortly after
Hobbs' ultimatum arrived.
Still impatient to know why CCB was
not getting underway, General Hobbs sent his assistant division commander,
Brig. Gen. William K. Harrison, jr., to find out. General Harrison reached the
task force about 1500; an hour later he was satisfied that General Bohn had the
situation well in hand.
With the task force commander still
muttering that "it was fatal to get on the roads . . . after all the
indoctrination by the Division Commander," General Bohn finally succeeded
in reorganizing the task force so that it could move in column along parallel
routes without the delay of plowing abreast through the fields. Anxious to give
higher headquarters some sign of progress, he directed a tank company to
proceed without delay and without pause southwest to the objective. The tank
company was to disregard communications with the rear, move to the St. Jean‑de--Daye‑Pont‑Hebert
highway, cross the highway, and continue on to Hill 91 at Hauts‑Vents.
Eight tanks of the company moved
ahead down a narrow country lane in single file, spraying the ditches and
hedges with machine gun fire as they advanced. They soon vanished from sight.
One reason higher commanders were so
insistent upon getting CCB rolling was their knowledge of the approach of
substantial enemy forces: from the west a part of the 2d SS Panzer Division, an infantry battalion supported by a tank
company; from the east the full power of the Panzer Lehr Division. Since early morning intelligence officers had
been expressing considerable concern about what appeared to be a strong enemy
effort in the making, particularly after aerial reconnaissance confirmed the
movement of enemy tanks toward the Taute and Vire sector. General Corlett suggested that a screen of
bazookas and antitank guns be thrown up close behind the forward troops, and
that all artillery units be alerted for action against enemy armor. A rash of
rumors spread through the ranks as everyone became acutely conscious of the probability
of counterattack. An incipient cloudiness turning into mist and later into
drizzling rain obscured the ground, denied further observation, and thwarted
air attack on the enemy columns.
Later in the morning on 9 July,
small probing elements of a tank‑infantry task force of the 2d SS Panzer Division struck the 30th
Division right flank near le Desert. The threat was contained by noontime, and
the 30th Division became satisfied that the anticipated German effort had been
stopped. Secure in this belief, the division artillery was displacing its
headquarters early that afternoon when enemy infantry, tanks, and self‑propelled
guns again struck the right flank. For more than an hour, during the critical
early stages of the German attack, the division artillery operated from its old
command post with limited means of communication. Not until the fire‑direction
center opened at its new location could unqualified co‑ordination with
XIX Corps be achieved. Despite some uncertainty as to the positions of several
U.S. infantry units, eighteen artillery battalions took the Germans under fire.
The artillery was chiefly responsible for checking the German thrust. More reassuring was the Imminent arrival on
that day of the 9th Division, which was to secure the 30th Division right
flank."'
Though beaten back, the
counterattack was not without consequences. Pursuing two Mark IV tanks down a
country road, a company of the 743d Tank Battalion (attached to the 30th
Division) fell into an ambush. German armor with screaming sirens attacked from
the flank at close range, and in fifteen minutes the tank company had lost most
of its equipment. Three damaged tanks were abandoned; nine tanks and a dozer
were destroyed; five men were dead, four wounded, and thirty‑six missing.
Having lost two tanks to enemy action the previous day, the company now was
virtually destroyed.
Although the 30th Division's
infantry generally held firm, a few overt acts were enough to cause hysteria
among some individuals. Occupying positions several hundred yards ahead of the
units on its flanks, an infantry company withdrew to improve its lateral
liaison and communications. About the same time, a limited withdrawal by a
nearby battalion prompted the erroneous report that an entire regiment was surrounded.
This exaggeration was typical of the
uncertainty and the rumors of disaster that spread through the bridgehead
during the afternoon. News of the destruction of the tank company fed the
apprehension and contributed to a panic that touched about 200 soldiers who
were performing close support missions. As soldiers streamed toward St. Jean‑de--Daye
in small, disorganized groups, two medical collecting stations, a cannon
company, and an infantry battalion headquarters, becoming convinced that the
enemy had made a penetration, also withdrew, but in good order, to the vicinity
of St. Jean‑de‑Daye. On the basis of these withdrawals, front‑line
units became concerned about the integrity and disposition of adjacent troops.
Several headquarters complained that subordinate units of other headquarters
were fleeing in disorder.
At the height of the counterattack,
the eight tanks dispatched by General Bohn were proceeding toward the St. jean‑de‑Daye‑Pont‑Hebert
highway. Several miles ahead of CCB's leading task force, and angling southwest
toward the highway, the tanks were to turn left when they reached the main
road. They were then to go several hundred yards south before turning right on
a secondary road to the objective, Hauts--Vents. Spraying the hedges and ditches
continuously with machine gun fire, the tankers reached the north‑south
highway. Instead of turning left and south, the company commander in the lead
tank turned right and north toward St. Jean‑de‑Daye. The other
seven tanks in column followed.
In the meantime, just south of the
St. Jean‑de‑Daye crossroads, a company of the 823d Tank Destroyer
Battalion had emplaced its 3‑inch guns along the main highway. Stragglers
falling back on the crossroads told the tank‑destroyer crewmen of a
breakthrough by German armor, which, the stragglers said, was just a short
distance over the hill. Air bursts exploding in the vicinity from unidentified
guns seemed to substantiate the reports. A short while later the reports took
on added credence when one of the 30th Division's regiments passed on the
erroneous information that fifty enemy tanks were moving north on the highway
from Pont‑Hebert toward St. Jean‑de‑Daye. Manning their guns
and outposting them with bazookas, the tank‑destroyer crewmen peered
anxiously through the drizzling rain of the foggy afternoon and listened for
the sound of tank motors.
They were
fully alert when the silhouette of a tank hull nosed over the top of a small
rise a thousand yards away. Although there was little doubt that this was the
enemy, a tank‑destroyer officer radioed his company to ask whether any
American tanks were in the area. The reply came at once: nearby armor was
German. By then several other tanks had come into view. Firing machine guns and
throwing an occasional round of high explosive into the adjacent fields, the
tanks moved steadily toward the tank‑destroyer positions. There could be
no doubt that these were anything but the long awaited enemy. The tank‑destroyer
guns opened fire at a range of 600 yards. The first round scored a direct hit
on the lead tank.
At this moment General Bohn at the
task force command post was trying to get in touch with the tanks he had sent
ahead. On the open radio channel he heard a cry of anguish and the voice of the
tank‑company commander say with awful clarity, "I am in dreadful
agony.
Before mutual identification could
be established, crews of the tanks and tank destroyers together had sustained
about ten casualties. Two tanks were knocked out.
Reversing direction, the six
remaining tanks began rolling back down the highway toward Hauts‑Vents.
Again they disappeared, again they lost communication with Bohn's headquarters.
Although the tank radios could transmit, they perversely failed in reception.
General Bohn subsequently succeeded
in getting the bulk of his leading task force to the St. jean‑de‑Daye‑Pont--Hebert
highway. By evening the task force was advancing toward the objective. The
third task force, having moved west and cross‑country in the rear,
debouched on the main road and rolled rapidly to the south.
Just as it began to appear that CCB
might complete its mission that night, General Hobbs ordered a halt. General
Bohn was to set up defensive positions astride the Pont‑Hebert road about
a mile short of Hauts‑Vents. Although Bohn requested permission to
continue‑on the consideration not only of weak opposition but also that
the armor was at last free of the constricting terrain and could reach Hauts‑Vents
before dark‑Hobbs refused.
General Hobbs had based his decision
upon the likelihood that the Germans might continue to counterattack after
dark. If the combat command took Hauts‑Vents, the division would have to
advance in a strong supporting effort. Although the division had sustained less
than 300 casualties that day, most of them from enemy artillery fire, Hobbs
felt that he needed to reorganize before attempting to attack. He judged that
strong defensive positions were more important. Without a supporting advance by
infantry, he believed that Combat Command B would be too far in advance at
Hauts‑Vents for adequate flank and rear protection in an area where enemy
strength was manifest. He told Bohn to direct his troops to "button up
along the line I gave them and get a good night's rest."
As the combat command assumed the
defensive, General Bohn tried to call back the six tanks that had disappeared.
Shortly before darkness, the tankers had reported being on the hill objective
at Hauts‑Vents. A moment later, an air mission, requested earlier but
delayed by the bad weather, struck Hauts‑Vents in the fading light.
Though American pilots strafed the six tanks, the tanks luckily escaped losses.
Unable to receive on their faulty radio sets, and ignorant of the order that
had halted the main force of CCB, the tankers formed a perimeter in a field at
darkness and awaited the arrival of General Bohn and the rest of the force.
The news that six tanks of Combat
Command B were on the objective was received at headquarters of both the 30th
Division and the XIX Corps with some skepticism. After forty‑eight hours
of disappointment, it was difficult to believe that the armor had finally
reached Hauts‑Vents. But since the possibility existed and because there
was further uncertainty about the precise positions of the rest of the combat
command, the corps and the division artillery had difficulty planning and
executing their harassing and interdictory fires for the night. This was the
final blow of another day of frustration in the attempt to achieve co‑ordination
between armor and infantry.
Having warned General Bohn of relief
if he did not reach his objective by 1700, General Hobbs removed him from
command five hours later. His grounds: the extreme caution that the combat
command had displayed in conducting an attack against relatively light opposition.
For the lack of aggressiveness throughout the command, he held the senior
officer personally responsible. Although Bohn's efforts on the afternoon of 9
July were commendable, he had not secured the co‑operation of his
subordinate commanders. Even though the limited roads and trails available to
the combat command had intensified the problem of regrouping from a
"hedgerow‑to‑hedgerow" advance to one "down roads
and trails," the failure appeared essentially that of command. "I
know what you did personally," General Hobbs assured General Bohn, ‑[but]
you're a victim of circumstances."
Under Col. Dorrance S. Roysdon, CCB
resumed the attack toward Hauts--Vents soon after daybreak on the third day, 10
July. The six tank crews, after waiting vainly all night for the combat command
to join them on the objective, returned at dawn. Had they remained at Hauts‑Vents,
they would have facilitated the advance of the main body. As it was, congestion
on the sunken roads and enemy antitank fire hampered the command almost at
once. A destroyed enemy tank blocked movement until bulldozers, maneuvering
tortuously on the narrow road, cleared a bypass. The column continued until the
destruction of the lead tank by enemy fire again blocked the way. The roads
were so jammed with traffic and movement was so slow that Colonel Roysdon
requested permission to use the main highway south to Pont‑Hebert instead
of the minor country roads leading southwest to Hauts‑Vents. General
Hobbs denied the request, for he wanted to keep the highway open for the 30th
Division to attack south once the armor took Hill 91. After a co‑ordination
conference attended by General Hobbs, General Watson, Colonel Roysdon, and an
infantry regimental commander, the combat command ' by midmorning, seemed to be
moving ahead. "Whatever confusion we had with the armor is reasonably well
ironed out," Hobbs reported. "Roysdon is kicking them along."
The honeymoon was short lived. That
afternoon, as the hedgerow terrain and German fire continued to retard the advance,
General Hobbs again became discontented. "If Colonel Roysdon doesn't do
what he can do, and should have done by noon today," he threatened, he too
would have to be relieved of command. Roysdon's "only trouble" was
that he "wasn't doing anything." "Please get them out of our
hair," Hobbs begged.
In the evening General Corlett
decided to detach CCB from the 30th Division as soon as Hill 91 at Hauts--Vents
was secured. The infantry division alone would continue to the ridge west of
St. Lo, the final corps objective.
By this time, Panzer Lehr was moving into the area. Hauts‑Vents was no
longer undefended and waiting to be occupied. A contingent of CCB did reach the
top of Hill 91 on the evening of 10 July, but strong enemy artillery and mortar
fire forced withdrawal. Though unsuccessful in seizing and holding the ground,
the contingent nevertheless disrupted Panzer
Lehr preparations for an attack that had been planned to start shortly
after midnight.
Combat Command B jumped off again on
the morning of 11 July. Enemy antitank guns east of the Vire River knocked out
six tanks immediately, but the attack continued. Reaching the crest of Hill 91
once more, men and tanks again had to give way. A second assault, led
personally by Colonel Roysdon, finally secured Hauts‑Vents during the
afternoon. The accomplishment caused Roysdon to characterize the morale of his
exhausted troops as "amazing"; his words of praise: "Enough
cannot be said.”
Earlier in the afternoon General
Hobbs had refused an offer by General Corlett of an additional tank battalion.
He already had three battalions of CCB, he said, "sitting on their
fannies." Not until a day later, with Hill 91 in hand, could Hobbs look at
the matter differently. He agreed with Roysdon that the combat command had done
a good job, and he regretted his relief of General Bohn. "If he [Bohn] had
had a little more of a chance," Hobbs admitted, "he probably would
have done the same thing [as Roysdon]."
The entrance of CCB into the
bridgehead had resulted in another frustration similar to those on the other
active portions of the First Army front. Five days of combat had advanced the
XIX Corps right wing only halfway to the ridge west of St. Lo. Great promise of
quick success had turned into failure primarily because of the un‑co‑ordinated
commitment of the combat command into restricted operational space. Whether
General Bradley had intended only a reinforced tank battalion to enter the
bridgehead on 7 July, as was later claimed, was an academic question by the
morning of 8 July. The entire combat
command had crossed the Vire and was on the ground, and that fact was
unalterable. Little more could be done than to hope that the armor would
disentangle itself from the congestion and the terrain. An opportunity to make
a deep penetration had been missed, for by the time the combat command got free
of its external repressions and its internal inhibitions, the Germans had
plugged the gap. Panzer Lehr was
ready to attack.