Chap15.htm
Chapter XV
Exploiting the Breach
Strictly considered, Operation COBRA
lasted only three days. By evening of 27 July, the situation had so evolved
that General Bradley could conclude that a successful penetration of the enemy
defenses had been achieved. He consequently issued oral instructions that were
embodied in a field order distributed on the following day. While the 2d Armored Division (less CCA)
completed its COBRA mission in action that continued through 30 July, the other units of the First
Army carried out the new orders to exploit the COBRA results.
The forces east of the Vire River
that were to have assignments in the exploitation had performed a subsidiary
role in COBRA. Their activity, essentially an act of diversion, had influenced
General Bradley's decision on how to direct the offensive growing out of the
COBRA breakthrough.
The COBRA Diversion
The diversion east of the Vire River
was predicated upon a desire to pin down enemy troops and prevent their
dispatch westward across the river against the main forces in Operation COBRA.
Exactly how this was to be accomplished General Bradley had left rather vague
while awaiting developments in the main attack. Thus the commanders of the two
corps east of the Vire, Generals Corlett and Gerow, had to plan their operations
on the basis of several contingencies and in the face of a number of question
marks.
General Corlett was to be prepared
either to displace his XIX Corps to the west bank of the Vire and assume a
portion of the VII Corps zone for a drive south or to remain east of the Vire
for a drive south along that side of the river. Until Bradley decided which
move was to be made, the XIX Corps was to give fire support to the VII Corps.
The future of General Gerow's V
Corps was even less definite. Though V Corps was to attack on 26 July, General
Bradley had designated no objectives. Nor could General Gerow count on a firm
commitment from the forces on his flanks. If XIX Corps, on his right, displaced
to a new zone west of the Vire, Gerow would have to extend his responsibility
westward to the river. If the British, who were to his left and whose
intentions were uncertain, did not advance, V Corps, by attacking, might expose
its own left flank. (See Map V.)
The V Corps front formed a curved
line about fifteen miles long, with the right flank on Hill 192, the center at
Berigny, and the left near Caumont. Early V Corps planning for COBRA had
projected an advance of about ten miles across the entire front, but in final
planning General Gerow directed instead a limited objective attack. Designed to
move the corps forward about three miles, the attack was to tie down Germans
east of the Vire; retain a measure of flexibility necessary for adjusting to
the developing COBRA operation; and eliminate a German salient between St. Lo
and Caumont that threatened American possession of St. Lo, denied desirable
lateral routes of communications (particularly the St. U‑Caumont
highway), and lengthened the V Corps front.
In the bocage east of the Vire River, irregular hills covered by hedgerowed
fields formed broken ridge lines and raised barriers against an advance toward
the south. In this terrain south of the St. Lo--Berigny highway and west of the
Berigny‑Caumont road, the Germans had excellent defensive positions on
commanding ground. On the first ridge south of St. Lo ‑ commonly called
Hill 101 ‑ the Germans had kept XIX Corps from moving beyond St. Lo; in
fact a strong counter reconnaissance screen had denied accurate knowledge of
German strength and dispositions. On the second ridge‑higher ground
between the villages of Ste. Suzanne‑sur‑Vire and St. Jean‑des‑Baisants‑the
enemy had excellent observation and supplementary defensive positions.
The goal of General Gerow's limited objective attack was the St. Jean‑des--Baisants ridge. Its capture would threaten to encircle the Germans on Hill 101 and thereby remove an obstacle hampering the XIX Corps. Once in possession of the St. Jean‑des‑Baisants ridge, General Gerow could either continue his attack to the south or take advantage of the terrain compartment and move southwest along the ridge line to Ste. Suzanne‑sur‑Vire and the Vire River. The latter maneuver would encircle the Germans on Hill 101.
General Gerow wanted to drive down
the St. Jean‑des‑Baisants ridge. The maneuver he hoped to execute
resembled, in miniature, the main COBRA operation west of the Vire. In the same
way that the VII Corps veered to the Cotentin west coast, the V Corps would
attack southwestward to the Vire River. Like the VIII Corps, the XIX Corps
would act as a holding force. In the same manner that a successful VII Corps
envelopment might block subsequent VIII Corps progress along the west coast of
the Cotentin, a V Corps drive to the Vire would obstruct an immediate XIX Corps
advance. If COBRA west of the Vire made possible an exploitation along the west
bank of the Vire, the V Corps envelopment to the Vire would pinch out the XIX
Corps and permit its displacement to make the main exploitation. The logic
appeared unimpeachable, the opportunity tempting. The boundary between the XIX
and the V Corps, tentatively drawn, ran southwest to the Vire River, indicating
that the XIX Corps was to be pinched out near Ste. Suzanne‑sur‑Vire.
General Gerow controlled two infantry divisions. On the right he had an experienced division, the 2d, under General Robertson. The 5th Division on the left, commanded by Maj. Gen. S. LeRoy Irwin, had recently arrived in Normandy and had freed the 1st Division for the main COBRA attack. Together, the divisions on the V Corps front easily outnumbered the Germans they faced. Twenty battalions of artillery were in support, and two tank destroyer battalions were tied in with the corps fire direction center. The relative inactivity of the V Corps before the start Of COBRA had enabled adequate stockpiling of ammunition.
Several days before COBRA, in
compliance with arrangements made by Generals Montgomery and Bradley, the
boundary separating the V Corps and the Second British Army was moved to the
west, giving the British responsibility for Caumont and reducing the 5th
Division zone to regimental frontage. General Gerow planned to attack with the
four regiments already on line, the three of the 2d Division and one of the
5th. Because the corps zone was divided into almost equal sectors by wooded and
swampy lowland that separated the interior regiments, Gerow projected two
simultaneous two‑regiment efforts that would converge on the St. Jean‑des‑Baisants
ridge. He expected to be in possession of the crest of the ridge in two days,
after which he planned to send the 5th Division southwest to the Vire River, to
St. Suzanne‑sur‑Vire.
Shortly after dawn on 26 July, 192
American and 44 British guns fired a twenty‑minute artillery preparation
to open the attack east of the Vire River. This was the precursor of a heavy
artillery effort that by the end of the first day was to consume half the
ammunition allocated to the V Corps for a five day period.
Concerned that two weeks of relative
inactivity in this sector had enabled the enemy to prepare extensive defensive
positions in considerable depth, the 2d Division commander, General Robertson,
had developed novel tactics for his attack. Tanks equipped with hedge cutters
and protected by time ‑ fuzed artillery fire advanced buttoned up and
without infantry support for several hundred yards to breach a few hedgerows in
depth across the front. Achieving surprise and taking no losses from enemy
fire, the tankers returned after twenty minutes to the line of departure to
pick up infantry support. Together the tanks and infantry moved quickly through
the gaps in the hedgerows before the Germans could re‑establish their
positions.
With the help of these tactics, two
of the 2d Division's three regiments made notable advances. On the division
left, the 9th Infantry used twenty‑five 50-caliber machine guns
previously emplaced on high ground to deliver flanking fire across the
regimental front and advanced steadily for almost two miles. Against artillery,
mortar, and slight small‑arms fire, the regiment nearly reached the St.
Lo‑‑Caumont highway. Comprising one half of the corps right flank
pincer force, the 23d Infantry gained almost a mile and reached a lateral
country road. There, German artillery and high‑velocity weapons placed
flanking fire on the road and prevented a crossing in strength. The fire also
made it difficult to evacuate casualties and bring up supplies. On the division
right, where the 38th Infantry composed the other half of the pincer force, a
comparable advance was made except on the extreme right. Stanch resistance and
an increasingly exposed right flank forced a halt. [Sgt.
Edward V. Maloney of the 38th Cavalry Reconnaissance Squadron, who though
mortally wounded continued to fire the guns of his tank to cover the defensive
preparations of his unit, was posthumously awarded the DSC. Pfc. Clifford L.
Curry of the same unit walked through fire on the battlefield to rescue a
wounded soldier. All fire "ceased in salute" as he carried the
wounded man back to safety. He was awarded the DSC.]
Employing artillery fire to good advantage, the only regiment of the 5th Division to attack, the 2d Infantry, also made a quick initial gain of about a thousand yards. It was making a flanking approach to the St. Jean‑des‑Baisants ridge when intense and accurate German fire caused considerable disorganization. Nevertheless, by committing all three battalions judiciously, the regimental commander, Col. A. Worrell Roffe, was able to keep the attack going another 1,500 yards. Cutting the St. Lo‑Caumont highway, the regiment made a total advance of two miles. [The intensity of the combat may be judged from the fact that five soldiers of the 5th Division were awarded the DSC, two posthumously: Pfc. Milo J. Flynn, Pfc. Amijan 0. Lazar, Pvt. Jack Gill, S. Sgt. Richard F. Heinzelman, and T. Sgt. Lloyd N. Peterson.]
By the end of the first day, the units of the V Corps had taken about 300 prisoners and advanced half way to the St. jean‑des‑Baisants ridge. The drive cost nearly a thousand casualties, chiefly from artillery fire." [Losses for the 2d Infantry were officially placed at 147, a low figure produced in compliance with a First Army order that estimates of men missing in action were to be "no higher than absolutely necessary." To equate its reported figures and its actual losses, the division reported higher losses during the succeeding days.] The assault troops had broken through the crust of the German defenses, though they had been unable to exploit local penetrations because of the terrain, the wide frontages, and, in the case of the 2d Infantry Regiment, a certain amount of disorganization within the battalions. The V Corps clearly appeared to be accomplishing its main mission of containing some of the German forces and preventing them from bringing their strength to bear on the main development of COBRA west of the Vire River.
Resuming the attack on 27 July, V
Corps advanced but did not reach its objective. The two regiments of the 2d
Division, comprising the right arm of the corps pincer movement, gained about a
thousand yards against resistance that was appreciably less determined than on
26 July. The regiments on the left were hampered by continuing disorganization
and nervousness among 5th Division units, still new in battle. Neither regiment
advanced. At the end of the day, V Corps was still more than a mile short of
the crest of the St. jean‑des‑Baisants ridge. The real achievement
was the contact made by the two interior regiments on the corps front. After
bypassing the wooded swampy lowland that separated them, the regiments had
turned inward and eliminated what had been the Berigny salient.
Denied the ridge he wanted, General
Gerow changed his plans around midday, 27 July. Dividing the corps zone equally
between the 2d and 5th Divisions, he alerted both to the possibility that
either or both might be designated to make the attack southwestward to the
Vire. The reapportionment of frontage
acknowledged the Strong resistance in terrain favorable for defense. It also was
a precautionary measure predicated upon readying the corps to absorb another
division, the 35th.
A possibility that the 35th Division
soon might pass to V Corps had become strong on the morning of 27 July when
indications developed that the XIX Corps might displace west of the Vire River.
Since the 35th was the only division of XIX Corps actually in the line, it
might be left behind when the corps moved.
Earlier, the XIX Corps had executed
Its COBRA mission by placing strong artillery fire on the ridges south of St.
Lo.
On 27 July the commander of the 35th
Division, General Baade, came to the conclusion that the Germans were
withdrawing primarily because of American gains west of the Vire. Deciding that
an advance was in order, Baade secured the corps commander's permission to
attack during the afternoon to secure Hill 101, the ridge immediately south of
St. Lo. As events developed, the attack was well timed. The Germans had begun
to withdraw during the morning, and the 35th Division took Hill 101 against no
more than light resistance. Several Vire River bridge sites southwest of St. Lo
fell in the process.
On the evening of 27 July, a
telephone call from First Army headquarters to General Corlett acknowledged the
changing situation brought about by COBRA. General Bradley had decided to
displace the XIX Corps west of the Vire River. As Gerow had anticipated,
Bradley attached the 35th Division to the V Corps and extended Gerow's
responsibility westward to the Vire.
COBRA had ended, and a new operation
was about to begin.
The Post‑COBRA Plan
In the COBRA plan, General Bradley
had not tried to forecast how the operation might end. Instead he was prepared
to choose his course of action from the actual COBRA results. He could halt the
offensive and consolidate his forces or continue his attack to exploit a
breakthrough. By the evening of 27 July it was apparent that the success Of
COBRA warranted a continuation of the attack, and Bradley decided to exploit
his gains and broaden and extend his effort.
Specifically, the enemy withdrawal
along the west coast of the Cotentin on 27 July ‑ later judged the
decisive consequence of COBRA ‑ seemed to offer an opportunity to hasten
the withdrawal and turn it into a rout.
The fact that the opposition east of Coutances was so strong appeared
particularly significantthe forces there were obviously trying ”to hold open
the door of retreat for the LXXXIV
Corps." Even the Luftwaffe put in an appearance‑a total of
thirty planes made eight daylight and sixteen night raids. The Germans had realized the danger of becoming
isolated on the Cotentin west coast and had attempted to escape encirclement by
withdrawing. "To say that ... [we are] riding high tonight is putting it
mildly," General Bradley wrote General Eisenhower. "Things on our
front really look good."
As judged by American intelligence
officers ‑ whose gratification over the COBRA results led to some
optimistic exaggeration ‑ the Germans in the Cotentin were in flight by
27 July. The only hope the Germans could have of stemming their retreat was to
gain refuge behind the See River at Avranches. The "bits and Pieces,"
the "shattered remnants," and the "battered portions" of
the units in the Cotentin were hardly in shape to make a stand unless fresh
troops came forward to reinforce them, and no fresh troops seemed available.
Thus the German course of action
would probably be an attempt to erect a hasty defensive line between Avranches
and the town of Vire, a line along the south bank of the See River and the high
ground south of Villedieu‑les‑Poees and St. Sever‑Calvados.
The possibility was also present that the Germans might counterattack from the
east with two panzer divisions, but this hardly seemed likely at the moment.
The significant conclusion was that "destruction of LXXXIV Corps is believed at hand, and the destruction of II Parachute Corps is an immediate
possibility."
To give the enemy "no time to
regroup and reorganize his forces," General Bradley ordered his
subordinate commanders to "maintain unrelenting pressure" on the
Germans. His great reliance on the
judgment of his corps commanders, as well as the fluidity of the situation, led
him to formulate his instructions in rather general terms.
There was no need for specifics. Two
immediate tasks lay ahead. The German forces still north of Coutances had to be
destroyed, those retreating to the south had to be pursued. Difficulties were
apparent.
On the Cotentin west coast, where
German disorganization seemed greatest, the VII and VIII Corps still had to
complete their COBRA mission of eliminating the German forces trapped near
Coutances. At the same time, the VII Corps, which had veered westward toward
the coast, now had to turn south. Futhermore, VII Corps threatened to cause
confusion by intermingling with VIII Corps units. The VIII Corps, in addition
to concern over the approach of the VII Corps toward its zone of advance, faced
mines and wrecked vehicles, obstacles that were serious hindrances to a rapid
advance in the restricted coastal road net. Time would be needed to regroup
both corps and clear the roads, minimum prerequisites, it seemed, for effective
exploitation south toward Avranches.
East of the Vire River, where only the V Corps remained, General Gerow's offensive was inevitably tied to British efforts on his left flank.
Only the XIX Corps received precise
instructions from General Bradley. General Corlett was to displace the XIX
Corps west of the Vire River and assume responsibility for what had been part
of the VII Corps zone. Corlett was to "attack aggressively" in a drive
south along the west bank of the Vire to a " goose egg" Bradley had
drawn on a map. The "goose‑egg" objective was about twenty
miles south of le Mesnil--Herman and encompassed the Fore de St. Sever and the
town of Vire.
If XIX Corps could secure its
objective, it would be into and partially through the highest terrain in
Normandy ‑ a hill mass extending from Avranches through Vire to Falaise
-- and would be able to deny the Germans use of the ground as the basis of a
new defensive line. Vire, an important road center less than twenty miles from
the base of the Cotentin, would provide the First Army an excellent pivot for
the wheeling movement projected a month earlier‑the turn to the east that
would allow other American forces to enter Brittany.
To take the step into Brittany, General Patton's Third Army headquarters was ready to become operational. When the Third Army became actively involved in operations on the Continent, the projected new U.S. command structure was to go into effect: General Bradley would take command of the 12th Army Group and Lt. Gen. Courtney H. Hodges, the Deputy Commander, First Army, would replace him as the First Army commander. It seemed as though the moment for the change might coincide with the end of the exploitation growing out of COBRA.
So that the U.S. forces could slip
neatly into the new command organization at the conclusion of the exploitation,
General Bradley made a special arrangement. He asked General Hodges "to
keep close track of" the three corps on the left. He informally appointed
General Patton a second deputy commander and assigned him the mission of
supervising the activities of the VIII Corps on the right. The VIII Corps,
scheduled to come under control of the Third Army, was to act as a bridge to
link the post--COBRA exploitation and the entrance of U.S. troops into
Brittany. The Third Army was expected to be committed and pass into Brittany
about 1 August.
In the meantime, although COBRA and
its consequences were an American responsibility, General Montgomery, as the Allied
ground commander, was vitally concerned to promote progress on the American
front. To create a diversion for COBRA, he had directed General Crerar to
launch a holding attack on the Canadian front from Caen toward Falaise. In
compliance, the 2d Canadian Corps had attacked on the morning of 25 July, at
the same time that COBRA jumped off. The Canadian attack met such resistance,
and set off such strong German counterattacks east of the Orne by two panzer
divisions, that Montgomery halted the attack at the end of the first day. Enemy
strength in the Caen sector was obviously too great for anything less than an
all‑out offensive effort, which Montgomery was unwilling or unable to
mount. On the other hand, the presence of formidable enemy forces near Caen made
it necessary for the British to exercise caution. Montgomery still considered
holding Caen, the pivot of the entire Allied front in Normandy, his principal
task, and to that end he set in motion deception measures and air and artillery
activity to keep the enemy off balance and prevent him from making a serious
threat against Caen. It was this that had brought Kluge to the Caen front on 27
July at the height of the COBRA action.
Despite his preoccupation with Caen, Montgomery endeavored to assist COBRA. Looking elsewhere along the eastern portion of the Allied front, he discovered that there seemed to be little if any German armor in the Caumont sector. He decided that an attack south from Caumont along the British‑American boundary by the Second British Army would take advantage of German weakness and be of value. Not only would it help COBRA by preventing the Germans from dispatching forces westward across the Vire River against the Americans, it would also ameliorate the situation at Caen by drawing German armored reserves away from that sector. With the former intention his avowed purpose, Montgomery ordered General Dempsey to attack south from Caumont on 30 July in an operation code‑named BLUECOAT.
Like GOODWOOD, the attempted
breakthrough effort south of Caen earlier in July, which had raised doubts
concerning Montgomery's primary and secondary motives, BLUECOAT had its
ambiguous aspects. If the original intention was to hold German forces in
place, thus keeping them from crossing the Vire and interfering with COBRA,
BLUECOAT came too late to influence the panzer division that Kluge was moving
from the Caumont region toward the American front. Yet because of the American
success, it seemed likely that the Germans would make a general withdrawal in the
Cotentin and try to swing their entire left flank back to Avranches. To do so
they needed a firmly held pivot point. A dominating hill complex culminating in
Mont Pineon‑five to eight miles south of the Caumont‑Villers‑Bocage
line‑in the British zone of advance seemed suitable for this purpose. If
the British denied the Germans the potential pivot point and got behind those
German forces trying to swing west to face the Americans, the German withdrawal
might disintegrate. This became the final purpose of BLUECOAT. With the object
of moving from Caumont through the Foret--I'Eveque to the town of Vire, the
British were to attack on 30 July.
Out of Operation
COBRA thus emerged a plan of exploitation, a plan that sought to intensify
German disorganization by relentless pressure on the American front and by a
quick thrust south from Caumont on the British front. If the plan succeeded,
the Allied turning movement toward the southeast would become a reality, and
American troops would be able to enter Brittany. For the plan to succeed, the V
and XIX Corps of the First Army and the right flank corps of the Second British
Army first had to secure a firm pivot point at the town of Vire.
East of the Vire River
While the British were preparing to
join the offensive east of the Vire, the V Corps resumed the attack. Assuming
responsibility for all the American‑held territory east of the Vire on 28
July by taking control of the 35th Division, General Gerow had free rein to
push the V Corps to the south in the general direction of the town of Vire.
Though General Bradley had assigned him no specific objectives, Bradley had
asked him to keep the army headquarters informed on his intentions and
progress. To his three divisions‑the 2d, 5th, and 35th‑General
Gerow stated his mission as he understood it: "We must keep going to maintain contact, and not give the Boche a
chance to dig in. See that all understand this."
As the opposing II Parachute Corps pulled back in the hope
of establishing defenses that could be tied in with the line the German units
west of the Vire were trying to form, the V Corps'on 28 July secured its COBRA
objective, the St. Jean‑des‑Baisants ridge from Ste. Suzanne‑sur‑Vire
to Vidouville. All three divisions advanced against light resistance and
captured few prisoners. Although the enemy seemed much weaker as a result of
the three‑day attack and thus made prospects of a virtually unlimited
advance seem possible for the V Corps, General Gerow was reluctant to initiate
an unrestrained attack because of the terrain and his left flank. (See Map VL)
The Souloeuvre‑Vire river
line, eleven miles beyond the St. Jean‑des‑Baisants ridge, appeared
the obvious V Corps objective. Although the water alone constituted an obstacle
to vehicular movement, the river runs through a ridge mass more than two miles
in depth that presented an even more serious barrier to military advance. Steep‑walled
hills from 600 to 900 feet high would provide the Germans dominant observation,
cover and concealment, fields of fire, and a good communications network.
Hoping to secure the area before the Germans could organize it for defense,
General Gerow nevertheless felt that the intervening terrain precluded a rapid
advance. In the heart of the bocage country,
the corps sector east of the Vire was a region of small irregular hills, small
winding roads, and small hedgerowed fields. Combat there was sure to resemble
the earlier battle of the hedgerows in the Cotentin.
The second factor working against an
unchecked V Corps advance was General Gerow's concern over his left flank.
Until the British attacked south from Caumont on 30 July (prevented until then
by difficulties of regrouping and deployment) and covered the flank, a headlong
advance by V Corps would expose an increasingly vulnerable side to the enemy.
General Gerow's solution for his two
problems was to set limits on his advance in order to keep tight control.
The Germans facilitated the V Corps
advance when the H Parachute Corps, with
permission, pulled back again. Moving
to the first limit of advance with very little difficulty, V Corps by noon 29
July held a line from Conde‑sur‑Vire to the British positions near
Caumont. When the corps commander ordered the attack continued, troops pushed
forward again for several thousand yards against sporadic resistance.
Despite the absence of an organized
German defensive line, the V Corps divisions did not have an easy time. The
terrain inhibited rapid advance, and ambush lurked around every twist in the
road. The bocage hills were populated
by German rear‑guard parties who used artillery, mortars, and small arms
fire effectively. One American regimental commander, apparently near
exhaustion, reported, "Things are not going very well," and said
he “would like to be relieved of
command." The division commander was not sympathetic. "I will relieve
you when I get ready to do so," he snapped, but later sought to soothe
him: "Do not get discouraged," he said, "this is hedgerow
fighting. It is tough." [On
the previous day, Colonel Hirschfelder, the 9th Infantry commander, had
inspired his assault troops by turning his back to enemy fire and, in full view
of the Germans, had removed his helmet, placed his hands on his hips, and asked
his men what was holding them up. This display of courage and of psychological
inspiration provided the spark for continued attack. Colonel Hirschfelder was
awarded the DSC.]
Receiving word that the Germans were
withdrawing all along the First Army front and learning that the British were
planning to attack on the following day, General Gerow on 29 July ordered his
division commanders into an all‑out advance. Instead of merely preventing
disengagement, the corps was to "drive strong and hard" in "a
relentless pursuit." As translated
by General Robertson, the troops were to "by‑pass everything. Never
mind these little pockets of resistance. . . . Let's get down and take a bath
in the Vire." (Map VII)

The instructions came too late.
Though army headquarters claimed that only some "tired old Austrians"
were in opposition, the troops had moved into contact with a defensive line
covering an important road net centering on Torigni‑sur‑Vire. As
the 35th Division on 30 July tried to take Torigni and the 2d and 5th Division
to occupy high ground east of the village, the Germans inflicted close to 1,000
casualties, halted the advance, and dashed American hopes for an immediate
pursuit.
To breach the new line, the
subordinate units of the V Corps made detailed attack plans, only to discover
as they prepared to launch a co‑ordinated offensive on the morning of 31
July that the Germans had disengaged.
Kluge had authorized the II Parachute
Corps to withdraw. In falling back,
the Germans abandoned not only the Torigni road net but also terrain that was
highly defensible. Only mines and sporadic harassing artillery fire opposed an
uninterrupted advance. American troops cheerfully advanced across undefended
ground, while their commanders chafed at the thought of the enemy slipping away
undetected.
Although all concerned pressed for speedy
pursuit, the pace of the V Corps advance slowed during the afternoon of 31
July. Nearing the Souloeuvre‑Vire water line, the corps encountered
pockets of resistance and delaying forces with increasing frequency. The
pursuit again threatened to come to a halt.
The boundaries delineating the corps zone of advance met near the town of Vire, fourteen miles southwest of Torigni. If the British on the left and the XIX Corps on the right advanced as projected, the V Corps would be pinched out near Vire. Blocking the approach to the V Corps limit of advance was the east‑west Vire‑Souloeuvre river line and hill mass, seven miles north of Vire.
These factors generally and a
conversation with General Bradley specifically governed General Gerow's desire
to cross the hills and the water barriers quickly. Earlier on 31 July, Gerow had instructed his division commanders
to move only as far as the river line. Later in the afternoon he ordered each
division commander to get at least one battalion of each front‑line regiment
across the river before dark.
On the corps right and in its
center, the 35th and 2d Divisions met such strong resistance on the approaches
to the water line‑and particularly near Tessy‑sur‑Vire‑that
it became obvious that they could not comply with instructions. [2d Lt. John F.
Hermanspan, Jr., of the 35th Division, after withdrawing his platoon from a
village, discovered that six wounded men had been abandoned there. Hermanspan
re‑entercd the village and created a diversion to cover the evacuation of
the casualties. Fatally wounded, Hermanspan was posthumously awarded the DSC.] On the other hand, the 5th Division on the
left met relatively light resistance, indicating that a hard push might gain a
bridgehead across the stream.
Unable to reach General Irwin, the
5th Division commander, personally, Gerow phoned one of Irwin's regimental
commanders and told him to mount his infantry on tanks. They were to bypass
resistance, use only good roads, and get to the water and across it in at least
battalion strength, "In short," Gerow commanded, "hurry.” Half an hour later he explained to Irwin,
"I told you before to stop at the river‑now I want you to change
that." The 5th Division was to cover the more than six miles to the river
line in record time.
Less than an hour after Gerow
forwarded these instructions, he learned that a British armored division had
attacked to the southwest, entered the V Corps zone, and secured two bridges
across the river. "Well now, I don't like British walking across our front
land] taking [our] objectives," General Gerow complained. But since the British had already secured a
bridgehead he saw no reason why the Americans could not use it, specifically
the 5th Division, for a quick drive across the remaining seven miles to the
town of Vire.
Unfortunately,
the intermingling of British tanks and American infantrymen caused confusion.
The opportunity for an immediate exploitation by either the British or the
Americans was lost. [the British
secured permission to move the armored unit on the road net across the 5th
Division front. Who gave permission is not stated.] One regiment of the 5th Division reached the north bank of the
Souloeuvre River during the early morning hours of i August. There it remained
throughout the day, out of contact much of the time with other division units.
By then, however, after having
advanced more than seven miles in six days, the corps had reached the end of
what had earlier promised to develop into an unlimited pursuit. On 1 August, as
the 35th and 2d Divisions fought near Tessy‑sur‑Vire to get to the
Souloeuvre‑Vire line, the boundary separating the British and Americans
was moved to the west, thereby narrowing the V Corps sector and pinching out
the entire 5th Division.
Part of the reason for the boundary
change was the success of the British attack south from Caumont. In compliance
with Montgomery's endeavor to deny the Germans the pivot point near Mont
Pincon, General Dempsey had launched the 8 Corps in Operation BLUECOAT on 30
July. Following a bombardment by 700 heavy bombers and 500 medium and light
bombers that dropped 2,200 tons of high explosive, the British attacked a
sector that was lightly defended. Only the bombed and inexperienced 326th Infantry Division stood in the
way. On the first day of the attack, the 11th British Armoured Division
advanced six to eight miles to come abreast of the V Corps east of Torigni‑sur‑Vire.
Operations on 31 July were hampered by the terrain: by the pronounced ridges
running across the axis of advance; by the streams, which flowed in all
directions and which in many cases were tank obstacles because of their width,
depth, or marshy approaches; and by the tortuous roads, which were often banked
by high hedges. But these difficulties were quickly overcome when the British
discovered that the Foret I'Eveque, which was astride the boundary between the Seventh Army and Panzer Group West, had through oversight been left unoccupied by
the Germans. A vital stretch of some 1,500 yards of country was theirs for the taking.
Thrusting through the forest, the 11th Armoured Division quickly gained the
south bank of the Souloeuvre River and by 1 August occupied high ground
immediately east of the Vire.
A Clash of Spearheads
While the V Corps and the British
were driving toward Vire from the north and northeast, XIX Corps was thrusting
toward Vire from the northwest. The evidence unearthed by COBRA indicated that
the Germans had nothing to stop a XIX Corps advance along the west bank of the
Vire, and General Bradley had acted on that premise. Unfortunately, Kluge had
not been idle.
As early as the evening of 27 July,
Kluge had begun to try to plug the spreading gap between LXXXIV and II Parachute
Corps. He seized upon the 2d Panzer
Division, then under Panzer Group
West control. The panzer division had been relieved from front line duty on
22 July by the 326th Infantry Division (which
had come from the Pas‑de‑Calais), and the armored unit had moved
into reserve southwest of Caen. Having had a few days of respite from battle,
the 2d Panzer Division was to move
westward and across the Vire River to launch a counterattack designed to close
the gap.
Kluge at first thought of using the
II Parachute Corps to direct the
counter attack, but he quickly decided to insert a new corps between the II Parachute and the LXXXIV. The LVIII Panzer Corps headquarters was moving from the Fifteenth Army toward the Panzer Group West area, and Kluge
considered employing the panzer corps in the Seventh Army center to handle the 2d Panzer Division counterthrust already planned to take place
toward Marigny and St. Gilles. Kluge soon recognized, however, that
the situation was changing too rapidly for him to await commitment of the LVIII Panzer Corps. Taking the XLVII Panzer Corps, which was not only
more experienced but also closer to the Cotentin, and replacing it in the Panzer Group West front with the
incoming LVIII, Kluge ordered the XLVII to take control of the 2d Panzer Division. By then the division
was moving to an assembly area directly behind the 352d Division on the west bank of the Vire.
Though Kluge was obviously concerned
by the gap in the middle of the Seventh
Army, he judged the Panzer Group West
front still to be the more critical sector. The 2d Canadian Corps had
launched an attack south of Caen toward Falaise on 25 July, and, although
commitment of the 9th SS Panzer Division had
soon checked the Canadians, continuing activity brought Kluge to that sector
again two days later, on 27 July. While he was there, Hausser and Choltitz were
struggling to maintain a semblance of order in the LXXXIV Corps sector. When Kluge returned to his headquarters that
evening, he learned that the LXXXIV Corps
sector was in turmoil. When he discovered, on the following morning, 28
July, that three divisions had to be considered lost in the Cotentin and that
the gap was larger than had been earlier reported, Kluge realized that the 2d Panzer Division would not be enough.
He needed more troops west of the Vire.
The 363d Division was en route to the Normandy front but was not
immediately available for commitment. The 9th
Panzer Division, released from the Nineteenth
Army in southern France, would not be on hand for about ten days. With no
alternative but to call upon Panzer Group
West and thereby weaken the front south of Caen, Kluge took the 116th Panzer Division, a unit that had
recently come from the Pas‑de‑Calais into Panzer Group West reserve. Together, the 2d and 116th Panzer
Divisions, under the command of the XLVII
Panzer Corps, were to attack north from Percy to close the gap between
Notre Dame‑de‑Cenilly and the Vire River.
Starting on the night of 27 July,
the 2d Panzer Division crossed the
Vire River at Tessy‑sur‑Vire and assembled near Moyon, three miles
northwest of Tessy. On 28 July the XLVII
Panzer Corps assumed command not only of the 2d Panzer Division but also of the remnants of the 352d Division near Beaucoudray and the
few remaining units of Panzer Lehr near
Percy. The 116th Panzer Division, making
a forced daylight march, was expected to be in position to attack northwest
from Percy on the following afternoon, 29 July. On 29 July the XLVII Panzer Corps also took command of
the 2d SS Panzer Division, deployed
between the Sienne River and a point east of Percy.
Meanwhile, Kluge was satisfied on 28
July that these arrangements were the best that could be made, particularly
since Warlimont had promised to ‑request permission from Hitler for the Seventh Army to withdraw to the
Granville‑Gavray‑Percy‑Tessy‑sur‑Vire‑Caumont
line. Kluge felt reasonably certain
that he could re‑establish a stable defensive line. The II Parachute Corps would remain
essentially in place, making minor adjustments to conform to the new defenses
but keeping the Panzer Group West left
flank well covered. The XLVII Panzer
Corps would plug the gap in the Seventh
Army center. And the LXXXIV Corps, it
still seemed at that date, would hold Coutances until strong forces withdrawing
south had reestablished a firm anchor at Granville for the entire German
defenses in Normandy. This was Kluge's hope. But first he had to reckon with
the XIX U.S. Corps.
General Corlett on 28 July was also
displacing troops west of the Vire River. He had hoped to take with him his two
experienced divisions, the 35th and 29th, leaving the untested 28th Division
(Maj. Gen. Lloyd D. Brown) on a relatively static front at St. Lo. But the need
for the 35th Division to advance south of St. Lo on 27 July to maintain
pressure on the withdrawing Germans changed Corlett's plans. The 35th Division
attack nevertheless provided an assist by securing an additional bridge over
the Vire southeast of St. Lo, thereby facilitating the movement of the 28th and
29th Divisions into the new corps zone.
At noon on 28 July, while the
displacement was being carried out, General Corlett assumed responsibility for
the units already engaged in his new zone‑the 30th Division and CCA of
the 2d Armored Division, the latter reinforced by the 4th Division's 22d
Infantry, plus the 113th Cavalry Group. (See
Map VL)
The XIX Corps mission of driving
south about twenty miles from le Mesnil--Herman to the town of Vire in what was
hoped would be a virtually uncontested pursuit contrasted with the previous aim
of the forces already engaged on the west bank of the Vire River. While under
VII Corps and engaged in Operation COBRA, the 30th Division and the reinforced
CCA of the 2d Armored Division had driven south to wall off the Vire River
against possible German attacks launched from the east. By noon, 28 July, they
were completing their COBRA assignments. The 30th Division, after securing
three Vire River bridges south of St. Lo, was moving against slight resistance
toward a natural stopping place, a stream south of the villages of Moyon and
Troisgots, where General Hobbs hoped to "get a little breather." CCA was in possession of its primary
COBRAobjective, le Mesnil‑Herman, and was probing toward the towns of
Villebaudon and Tessy‑sur‑Vire.
Less concerned with blocking a
possible German move across the Vire than with launching a rapid advance to the
south, General Corlett believed a quick movement to his objective to be
possible. Estimates indicated that the XIX Corps faced fewer than 3,000 German
combat effectives‑disorganized and battered units supported by only four
artillery battalions and scattered batteries of selfpropelled guns. Without
prepared positions and lacking reserves, the Germans could make a stand at only
two places, on high ground south of Tessy‑sur‑Vire and on
commanding terrain near Vire.
One speck blemished this optimistic view.
While reconnoitering in force from le Mesnil‑Herman toward Villebaudon
and Tessy‑sur‑Vire on 27 July, task forces of CCA had encountered
increasing resistance that denied advance of more than two miles in each
direction. It became apparent that part
of the 2d Panzer Division, believed
moving westward, was already west of the Vire River. Although Allied planes
were harassing the enemy's approach, the panzer division was judged capable of
getting at least a motorized infantry regiment and about twenty tanks in front
of the XIX Corps by the morning of 28 July.55
So long as this estimate remained
only a pessimistic possibility, General Corlett saw no reason why he could not
advance beyond Tessy‑sur‑Vire and block off this excellent crossing
site before the 2d Panzer Division and
other German units could offer serious resistance. Thus he designated the high
ground south of Tessy‑along the Percy‑Pontfarcy line as the initial
corps objective. With this potential enemy defensive line neutralized and with
the 28th and 29th Divisions in place for the attack, he would drive to the town
of Vire.
To seize the Percy‑Pontfarcy
line, General Corlett directed General Hobbs to take Tessy‑sur‑Vire
with the 30th Division and block the river crossing sites. No doubt recalling
the confusion that had occurred in the Taute and Vire bridgehead area when the
30th Division and a different combat command had intermingled, the corps
commander halted movement of the 2d Armored Division's CCA toward Tessy‑sur‑Vire. Instead, the reinforced CCA was to
concentrate on the right of the corps zone and attack south through Villebaudon
to Percy. Counting on the mobility of the armored force and on continuing enemy
disorganization, Corlett instructed the armored commander, General Rose, to move
from Percy eastward to the Vire River. This would serve to encircle Tessy from
the west and isolate the town from the south. Then the 29th Division, and
later the 28th, would attack to the
south.
As events developed, these
arrangements were too late, for on 28 July the 2d Panzer Division was assembling west of the Vire River on a small
plateau around Tessy‑sur‑Vire. The panzer troops gathered behind an
east‑west tributary of the Vire River‑the stream running south of
Moyon and Troisgots and in the area immediately northwest of Tessy for an
attack to the northwest. To protect the assembly of the .2d Panzer Division, Kluge had instructed Hausser to have the II Parachute Corps, which still
straddled the Vire River, establish a strong defensive line from Moyon eastward
through Conde‑sur‑Vire and Bieville to Caumont, where it was to tie
in with the LVIII Panzer Corps. Although the line east of the Vire‑from
Conde‑sur‑Vire through Bieville‑had successfully delayed the
V Corps north of Torigni‑sur‑Vire, the slashing COBRA attack of the
30th Division and CCA had invalidated positions along that line west of the
Vire. CCA had already outflanked the line on the west by reaching Villebaudon
on 28 July, and the 30th Division was approaching Troisgots.
The remnants of the 352d Division, reinforced by elements of
the 2d Panzer Division as they
arrived, got set to hold the Moyon‑Troisgots line. As troops of the 30th
Division descended a naked slope during the afternoon of 28 July and moved
toward the stream and a long incline behind it, they came under intense fire.
The configuration of the terrain exposed the attackers and gave the defenders
defilade. American counterbattery missions seemed to have no effect on enemy
fire, and from the ridge just south of the Moyon‑Troisgots stream German
machine guns, tanks, self‑propelled guns, and artillery denied advance.
Although General Hobbs committed his
reserve regiment on the following day, 29 July, the forces failed to move
forward. Certain internal difficulties were apparent: the troops were
exhausted, a shortage of telephone wire hampered communications, and
fighter-bombers in close support inadvertently strafed and bombed several 30th
Division units. But the principal reason why the 39th Division did not take
Troisgots was the presence of the fresh and strong 2d Panzer Division defending advantageous terrain. Two co‑ordinated
attacks against Troisgots‑the bastion of the defensive line‑by all
three regiments of the 30th Division abreast on 30 July and artillery fire
exceeding thrice the amount usually expended still failed to propel the
division beyond the line of departure. Enemy shells knocked out six of nineteen
tanks supporting one regiment. [
S/Sgt. J. W. Parks, who though wounded took command of a platoon after both the
platoon leader and the sergeant became casualties, T. Sgt. Fred D. Steelman,
who exercised heroic leadership, and S. Sgt. Frederick W. Unger were awarded
the DSC for their actions.]
By this time General Corlett had
changed the division objective from Tessy‑sur‑Vire to
Troisgots. Not only did Tessy seem
completely out of reach for the moment, even Troisgots appeared unattainable.
The 30th Division was far from getting the "little breather" General
Hobbs had hoped for.
For all the indications of failure,
the 39th Division to a great extent had prevented the 2d Panzer Division from launching its own counterattack. Hausser
had helped the Americans too. Having become convinced that the XLVII Panzer Corps attack had failed
even before it got started, Hausser ordered the corps to assume defensive
positions along a broad front between the Vire River and Gavray. Kluge
countermanded the order at once, but the resulting delay as well as inevitable
confusion on the staff levels harmed the offensive purpose.
Some credit for balking the 2d Panzer Division's offensive
intentions also belonged to the 2d Armored Division's CCA, which had made its
weight felt on the right of the 3oth Division. By noon of 28 July, when General
Corlett assumed control, General Rose's combat command had already secured
Villebaudon. An armored column conducting a reconnaissance in force that
morning had destroyed six German armored vehicles and a Mark IV tank and had
overrun about fifty soldiers to take the village. Another column reconnoitering
simultaneously toward Tessy‑sur--Vire, in contrast, met strong armored
forces obviously belonging to the 2d
Panzer Division and returned to the vicinity of le Mesnil‑Herman.
Ordered to discontinue the thrust toward Tessy, directed instead to attack
along the axis from le Mesnil‑Herman through Villebaudon to Percy, and
strengthened by attachment of the 113th Cavalry Group, General Rose immediately
reinforced his troops in Villebaudon with the cavalry group and the 14th
Armored Field Artillery Battalion.
Although the route south from le
Mesnil‑Herman to Percy seemed clear of large German contingents, the
arrival of the 2d Panzer Division in
the Tessy‑sur--Vire region threatened the CCA line of communications. The
roads leading west from Tessy were excellent for supporting German armored
thrusts toward Villebaudon and Percy. To prevent the panzer troops from cutting
the north south le Mesnil‑Herman‑Villebaudon--Percy road, General
Rose tried to erect a barrier along his eastern boundary. He had divided CCA
into three task forces, each consisting of a company of the 22d Infantry, a
medium tank company of the 66th Armored Regiment, a platoon of light tanks, and
supporting units. Since one task force was already in Villebaudon, he sent the
other two south and southeast from le Mesnil--Herman toward Moyon, giving them
the eventual objective of cutting the eastwest Villebaudon‑Tessy highway
and thereby providing flank protection for the main attack to Percy.
The task force that attacked
southeast from le Mesnil‑Herman on the afternoon of 28 July drove through
le Mesnil‑Opac and destroyed five Mark IV tanks and four antitank guns
without loss. However, increasingly heavy opposition from roving tanks,
infiltrating infantrymen, antitank and dual‑purpose antiaircraft guns,
mortars, and artillery forced the column to return to le Mesnil‑Herman.
The task force attacking to the south reached the village of Moyon but, unable
to go farther, also returned to le Mesnil--Herman.
Meanwhile, the Germans threatened to
cut the main road between le Mesnil--Herman and Villebaudon and isolate the CCA
spearhead. Three enemy tanks actually moved westward from Moyon and seized a
crossroads near la Denisl&e. Reversing one battery to fire north from
Villebaudon toward la Denisiere at very short range, the l4th Armored Field
Artillery Battalion soon drove the three tanks away. Unable to cut the road
physically, the Germans attempted to seal off Villebaudon by interdictory
artillery fire along the highway. The shelling of the la Denisi6re intersection
remained heavy, but American ammunition and supply vehicles, forced to speed
through the crossroads at irregular intervals, managed for the most part to
evade damage.
On 29 July General Rose sent both
task forces from le Mesnil‑Herman to take the village of Moyon. Though
the attempt failed, the CCA task force in Villebaudon moved south to Percy
against light resistance. Percy proved untenable. The armored force withdrew to
hills north of the town and awaited reinforcement. Threatening to block
reinforcement, the Germans again cut the axis of communication behind the
advance units near Percy. As enemy artillery interdicted the le Mesnil‑Herman‑Percy
highway and as enemy tanks dueled with American tank destroyers, small German
detachments infiltrated across the route and set up hasty roadblocks.
The arrival of the 29th Division,
while not ameliorating the situation at once, gave hope of improvement in the
near future. Two of General Gerhardt's regiments‑the 116th and 175th‑moved
into the line near Moyon and Percy to relieve the CCA task forces, which then
assembled near le Mesnil‑Herman. Directed to advance through Villebaudon
and Percy, the third regiment, the 115th Infantry, was stopped by the German
roadblocks on the highway. Although General Corlett that evening optimistically
ordered an advance to Vire, the corps objective, it was obvious that he first
had to eliminate the enemy bridgehead at Tessy‑sur‑Vire.
To eliminate the bridgehead, General
Corlett decided to shorten CCA's planned envelopment of Tessy. Instead of
moving eastward from Percy, General Rose was to strike east from Villebaudon.
If successful, the combat command might outflank the enemy's Moyon‑Troisgots
line. The 29th Division would then be able to proceed through Villebaudon and
Percy and launch the drive toward Vire.
On the morning of 30 July, a
reinforced tank battalion and an infantry company of CCA moved from le
Mesnil--Herman through Villebaudon, turned east toward Tessy‑sur‑Vire,
and immediately met firm opposition. A fire fight involving forty American
tanks as well as infantry and antitank guns lasted all day. The 2d Panzer Division was tied down in the
Tessy region, but the 116th Panzer
Division had appeared on the scene. After being harassed and delayed by
Allied airplanes during its march across the Vire River, the 116th finally jumped off on the morning
of 30 July. At once it became bogged
down in a struggle for the hills around Percy, Villebaudon, and Beaucoudray. (See Map VIL)
For the Americans, the problem of
taking Tessy vanished under the more pressing need to hold Villebaudon. While
the 28th Division's 109th Infantry remained north of le Mesnil‑Herman to
constitute the corps reserve, the other two regiments of the division‑the
110th and 112th‑moved south of le Mesnil--Herman to back up the defense
of Villebaudon. The 116th and 175th Regiments of the 29th Division exerted
pressure meanwhile against Moyon and Percy, and the 30th Division placed
pressure against Troisgots. As a result of this corps‑wide effort and of
assistance from fighter‑bombers that struck Tessysur‑Vire several
times during the day, CCA retained possession of Villebaudon. Meanwhile, the 29th Division's 115th
Infantry, which had been blocked south of Villebaudon, finally reached the
outskirts of Percy.
The 14th Armored Field Artillery
Battalion played a significant part in the battle on 30 July‑ Ordered to move from Villebaudon to Percy that
morning, the battalion had formed in a march column with the heads of the
battery columns on the main road leading south. Before the move started, news
of the counterattack prompted the unit to hold in place and assume firing
positions. Although scattered small arms fire struck near the guns for an hour
around noon, the artillerymen accepted and fulfilled all fire missions. They
marked enemy attack concentrations with red smoke to lead fighter‑bombers
to lucrative targets. They also engaged enemy tanks at ranges of less than
2,000 yards. Finally, when German fire became too intense, they withdrew to new
positions north of Villebaudon. There the 18th and the 65th Field Artillery
Battalions were attached to the 14th Armored Field Artillery Battalion, which
also assumed operational control of the 44th Field Artillery Battalion through
its fire direction center. Controlling the fires of four battalions of 105‑mm.
howitzers, the l4th also co‑ordinated missions for the XIX Corps
Artillery, which sent a liaison officer to the battalion for this purpose.
At the end of 30 July, the XIX Corps
still was seriously engaged in the Percy--Tessy‑sur‑Vire area. From
the high ground between Percy and Tessy, the Germans shelled the American units
effectively and interdicted the roads in the Villebaudon area at Will. Still trying to eliminate the German
bridgehead at Tessy, General Corlett Ordered the attack to resume on 31 July,
but with a modification. From positions forming an arc from Moyon through
Villebaudon to Percy, all three regiments of the 29th Division‑the 116th
on the left (north), the 175th in the center, and the 115th on the right (the
115th after relief near Percy by the 28th Division's 110th Infantry)‑were
to attack eastward toward Tessy and support another attempt by CCA to destroy
the bridgehead. While this attack was in progress, the 28th Division was to move
south through Villebaudon to Percy to get into position for a drive south to
Vire.
About noon, 31 July, two battalions
one from the 66th Armored Regiment and the other from the attached 22d Infantry‑advanced
eastward from Villebaudon toward Tessy‑sur‑Vire to spearhead a 29th
Division supporting attack. Halfway to Tessy, the armored troops encountered
several enemy tanks in a wood on the far side of a ravine. Unable to find a
crossing site over the ravine and receiving heavy artillery fire, they halted and
took cover while fighter-bombers attempted without success to dislodge the
Germans. The troops of the 29th Division, like the spearhead, were unsuccessful
in achieving more than limited advances.
Meanwhile the 28th Division was
moving south toward Percy and on that day assumed responsibility for its zone.
The move was far from successful, even though the division was moving through
what was essentially a rear area. [
S/Sgt. Walter R. Tauchert, armed with a rifle and grenade launcher, destroyed
two machine guns, routed an armored vehicle, and enabled his platoon to reach
its objective. He was awarded the DSC posthumously.] Displaying the usual symptoms of a unit new
to combat, the troops of the 28th Division would need several days to overcome
a natural hesitancy to advance under fire, to become accustomed to maneuvering
in unfamiliar terrain, and to learn the techniques of advancing through
hedgerow country.
A significant change in the
situation occurred on 31 July in the 30th Division sector, where General Hobbs
was trying for the fourth day to take Troisgots. For the attack on 31 July,
Hobbs placed his entire attached tank battalion at the disposal of the 119th
Infantry, which was to make the main effort in the center of the division
front. The gesture was more impressive in theory than in fact since losses had
reduced the tank battalion to thirty‑four lights and mediums, of which
only thirteen Shermans actually were available for front‑line duty. Accompanied by these tanks, the 119th
Infantry was to press in on Troisgots from three sides as the other regiments
supported.
An infantry battalion and a few supporting
tanks managed to get into Troisgots during the afternoon and destroy by tank
fire and bazooka shells several enemy tanks and self‑propelled guns, the
heart of the German defense. Success was in a large measure due to 1st Lt.
Harry F. Hansen of the 743d Tank Battalion, who dismounted from his tank and
led two infantrymen with bazookas to positions from which to fire on three
hostile tanks. Two burst into flame upon direct hits, the third retired. By evening the regiment was mopping up the
village. The Germans had given way most reluctantly. The fall of Troisgots had
been "no collapse.
Capture of Troisgots occurred as
news came to the Germans that Americans in the Cotentin were threatening
Granville and even Avranches (indeed, had perhaps taken them) and that British
and Americans were advancing toward the town of Vire. Withdrawal became
imperative. Kluge's authorization for the Seventh
Army to pull back to a line that would still protect Granville, Tessy‑sur-Vire,
and Vire seemed unrealistic. The
forces between Percy and Tessy began to withdraw, shifting slightly westward
toward Villedieu and Gavray.
Suspecting the imminent collapse of
the German positions, General Corlett ordered his subordinate commanders to
maintain vigorous patrolling during the night to maintain contact with the
enemy. "Watch ... and see that he does not pull out," Corlett warned. If a withdrawal was discovered, the units
were to pursue. Since Corlett felt that the Germans would continue to hold
Tessy‑sur‑Vire to cover their withdrawal, he planned still another
attack for 1 August. Attaching CCA to the 29th Division, he ordered General
Gerhardt to drive eastward again from Villebaudon to Tessy‑sur‑Vire
while the 30th Division pressed against Tessy from the north. The 28th Division
was to move south through Percy and attack toward Vire.
On the morning of 1 August, CCA
spearheaded the 29th Division attack by again moving toward Tessy‑sur‑Vire
with an armored battalion on each side of the highway. A unique armored point
of five vehicles moved ahead of the force. A light tank, acting as a decoy,
advanced along the road; two medium tanks, one hundred yards ahead of the light
tank, moved along the sides of the road to flush and engage enemy tanks; and
two tank destroyers, two hundred yards behind the light tank, advanced along
the sides of the road, alert to reinforce the medium tanks by quick fire.
Taking advantage of ground mist, the men and vehicles of CCA crossed the ravine that had held up progress on the previous day and overran and destroyed a column of German vehicles. Although three American tanks entered the outskirts of Tessy during the morning, the Germans drove the crewmen out after all three tanks developed mechanical failures.
Earlier on 1 August General Hobbs
had instructed the 120th Infantry to send a token force to participate in the
capture of Tessy‑sur‑Vire. "We were suddenly ordered . . . to
take off for Tessy," explained the commander of the rifle company selected
for the mission, “so we took off."
Without an artillery forward observer, the company moved cross‑country
to within a mile of the town before an enemy machine gun and several mortars
took the troops under fire. Knocking out the machine gun with grenades, the
infantrymen infiltrated Into the edge of Tessy. Having understood that Tessy
had already been secured by CCA and that he was merely to set up roadblocks
there, the company commander was disconcerted when enemy forces appeared and
drove his men out helter‑skelter.
CCA mounted a second attack that
afternoon and penetrated Tessy. Men of the 22d Infantry cleared the center of
the town and crossed the river to establish outposts. In the meantime, several
CCA tanks rumbling through the northern outskirts of Tessy restored spirit to
the company of the 30th Division that had earlier been driven out. "The
tanks could have had wooden guns," said one of the men. Their presence
alone was invigorating. Together, infantrymen and tankers cleared the northern
outskirts.
Getting into Tessy did not mean that
the town was secure. German artillery shells continued to fall into the streets
until the 35th Division of the V Corps across the river took high ground east
of the town on the following day, 2 August. At that time, the 3oth Division
passed into XIX Corps reserve and CCA reverted to 2d Armored Division control.
The XIX Corps was still far from its
POST‑COBRA objective. But it had contributed handsomely to the final
success growing out Of COBRA. By blocking for five days the German attempt to
reestablish a defensive line across the Cotentin, XIX Corps had enabled troops
on the First Army right to make a spectacular end run.